
When preparing to light up a fiber service area in Vision, several systems and setup items may need to be reviewed before the area is ready for internal operations, installation workflows, and customer-facing sales. This checklist can be used for a company setting up its first service area in Vision, adding a new service area to an existing product offering, or expanding into a new market.
Please note that this is a general guide and may not cover every step required for your specific setup. If you have questions about any part of the process, please reach out to the Support Team for assistance.
Quick Links:
Plant records should be reviewed first, since they help define the physical network information that may need to be represented in Vision. This may include records from integrated plant management systems such as 3-GIS, IQGeo, OZMap, or Vetro, depending on what your company uses for plant design and fiber records.
Items to review:
Addresses should be reviewed and can be mass imported if the dataset is available. This Vision can recognize addresses in the service area. This may include serviceable addresses, test addresses, lead subscriber locations, or locations used for validating drops and plant records.
A subscriber location should be available in the new service area. This can be a simple test address or an actual lead subscriber. Regardless of which is used, a drop should be imported in the area so the patch panel modeled in your plant records software can be created in Vision.
Items to review:
Inventory and hardware records should be reviewed so Vision has the correct equipment information for the service area. This may include warehouses, cabinets, OLTs, cards, ONTs, splitters, and other hardware items.
The address information for the new fiber cabinet or CO should be tracked in Vision as a warehouse. Hardware details for the new OLT and any installed cards should also be added. These details may be entered manually or, in some cases, pulled from AOE if the device is online and the setup is being backfilled.
Items to review:
Provisioning setup should be reviewed for any systems or hardware platforms that will be integrated in the service area. This may include Adtran, Calix, Nokia, or other speed shaping systems.
Items to review:
Authentication and IP management should be reviewed if the company tracks or assigns IP information through Vision or related systems. This section may be optional if the client does not track IPs in Vision or does not need IP-related setup for the service area.
Items to review:
After the necessary drop and patch panel information exists in Vision, any known cross-connect relationships can be modeled. This may include relationships between patch panel ports and PON ports.
Items to review:
Once the foundational network, location, hardware, and patch panel information has been reviewed, the next step is preparing the area for service availability and sales. Service areas, packages, service items, and offers determine which services are available to customers in the new area.
Items to review:
Online sales and marketing setup should be reviewed before the service area is opened for customer interest or customer signups.
In some cases, the first step may be lead generation rather than direct package selection. For example, customers may submit interest through a form so your team can gather demand, track interested addresses, and follow up when service becomes available.
Items to review:
The installation workflow should be reviewed before launching the service area. If an installation workflow already exists, confirm whether it can be reused as-is or if changes are needed for this specific area.
Items to review:
Calendar and scheduling setup should be reviewed so that installs and field work can be assigned correctly once the service area is ready.
Items to review:
Before opening the service area for lead generation, sales, or scheduling, review the full setup with the appropriate teams.
Final launch questions: